top of page

Commercial Heating for Housing Associations - How DD Wilson Restored Hot Water to 36 Elderly Residents in Five Days

  • 5 hours ago
  • 12 min read

When a gas-fired hot water cylinder burst and flooded the plant room at Robert Lynch House, thirty-six elderly residents were left without heating or hot water. DD Wilson Gas & Heating Engineers completed a full commercial Rinnai hot water system installation in five working days, a job that industry standard timelines put at six to twelve weeks.


White water heater with "DANGER: SAFETY WARNING DO NOT USE" sign. Andrews Water Heaters logo visible. Crack runs down front.

Commercial Heating for Housing Associations - What Happened at Robert Lynch House

Robert Lynch House is a housing association residential block in the Northwest of England. It contains thirty-six individual flats, two communal rooms, and a kitchen that serves the elderly residents. The building's hot water and heating are supplied through a centralised plant room, making it what is now classified under the new Ofgem regulations as a communal heat network.


On a Friday in early 2026, one of the building's ageing gas-fired hot water cylinders failed catastrophically. The cylinder burst, flooding the plant room and taking the entire building's hot water supply offline. Thirty-six elderly residents, along with the communal kitchen and shared living spaces, were left without hot water or heating.


For anyone managing a housing association property, that scenario is about as serious as it gets. Elderly and vulnerable residents without heating or hot water in the middle of winter require an immediate response, not a six-week procurement process.


Why DD Wilson Could Respond So Fast

The typical timeline for a commercial heating emergency of this scale is stark. Most commercial heating engineers require four to six weeks just to plan and mobilise before any physical work begins. From first contact to a fully operational system, housing associations often expect six to twelve weeks. That is the industry norm.


DD Wilson Gas & Heating Engineers had been working with Robert Lynch House for approximately two years prior to the emergency. When the building's previous commercial engineer retired, DD Wilson was brought in to take over the ongoing commercial boiler servicing and maintenance. During that time, the team carried out regular repairs, surveyed the existing systems, and sent detailed quotes for upgrades that were clearly needed.


That groundwork changed everything when the emergency hit.

DD Wilson received the call on Saturday. Work started on Monday morning. The new commercial hot water system was fully installed and operational by Friday. Five working days from start to finish.


The speed was possible for three reasons. First, DD Wilson already had intimate knowledge of the building's existing systems and infrastructure. Second, detailed quotes and system specifications were already prepared, requiring only minor alterations. Third, DD Wilson operates with the same efficiency and responsiveness in commercial work as it does across its domestic boiler installations, moving engineers and resources quickly between jobs without the bureaucratic lag that slows down larger contractors.


This kind of rapid response is something DD Wilson has built its reputation on. Read about how the team handles emergency boiler replacements across Liverpool and what that means for homeowners and businesses when their heating fails without warning.

We installed Rinnai Continuous Flow Hot Water Heaters

The failed gas-fired hot water cylinders were replaced with three Rinnai continuous flow hot water heaters. Rinnai is a global manufacturer of commercial and domestic water heating products, with its UK headquarters based in Runcorn, Cheshire. Rinnai manufactures over two million water heating units per year worldwide, and its commercial products are installed across Premier League football clubs, Transport for London facilities, hospitals, hotels, and university accommodation blocks throughout the UK.


The old cylinders, several of which were already marked "Do Not Use" due to their condition and inefficiency, were well past their service life. The decision to install Rinnai units at Robert Lynch House was based on four key factors.


Intelligent load sharing through relay operation. The three Rinnai units operate independently on a relay system. When a small number of flats call for hot water, a single unit fires up to meet the demand. As demand increases across more flats, additional units come online automatically. The system distributes the load evenly across all three heaters, so no single unit is overworked and each operates at optimal efficiency for longer.


Built-in redundancy for uninterrupted supply. If one of the three units ever requires maintenance or develops a fault, the remaining two units can supply the entire building. This design means the Robert Lynch House should never again face a situation where a single equipment failure leaves all thirty-six flats without hot water. For a housing association managing the welfare of elderly and vulnerable residents, redundancy is not a luxury. It is a necessity.


A projected fifty per cent reduction in gas costs. The old gas-fired cylinders were highly inefficient. They heated and stored large volumes of water continuously, losing significant energy through heat loss to the surroundings. Rinnai continuous-flow heaters operate on demand, heating water only when needed and storing none within the units. That on-demand operation, combined with modern condensing technology, is projected to cut the building's gas bill by approximately 50%. DD Wilson regularly helps customers improve their boiler efficiency across Merseyside, and the same principles of eliminating waste and optimising system performance apply at a commercial scale.


Water heaters on a wall with pipes and brackets below. Tools and open boxes scattered on the floor in a utility room.

Hydrogen-ready technology for long-term compliance. Every Rinnai unit installed at Robert Lynch House is hydrogen-ready. This means the boilers can currently operate on natural gas but are designed to be adapted for hydrogen-blended gas when it becomes available through the UK gas network. Rinnai units are capable of blending up to 30% hydrogen with natural gas and can be modified to support 100% hydrogen as required. For more on what hydrogen-ready means for the future of heating, read our guide to hydrogen-ready boilers.


As part of the installation, DD Wilson also fitted a large vertical commercial flue on the building's exterior. That is the silver pipe visible on the outside of the Robert Lynch House in our photos and video. The flue installation required a cherry picker and full access control measures throughout the works. The work was led by Stephen Boardman, one of DD Wilson's commercially qualified engineers. Stephen holds Gas Safe accreditations across central heating, water heaters, flue liners, non-masonry flues, and combustion performance analysis for both natural gas and LPG. He is also certified to self-certify compliance with Building Regulations, covering heating systems, hot water systems without storage, extensions to existing heating systems, and flue gas heat recovery devices. For housing associations, having an engineer on site who can handle both the gas installation and the Building Regulations sign-off in a single visit removes a layer of complexity and delay from the project.


Why DD Wilson Advised Against Air Source Heat Pumps

Before the emergency, the building's management team had been considering air source heat pumps as a long-term replacement for the ageing gas heating infrastructure. Darren Wilson, who founded DD Wilson Gas & Heating Engineers over 27 years ago, advised against it.


The reasoning was straightforward. The UK government's Heat and Buildings Strategy has set out a trajectory towards decarbonising building heating. Hydrogen is expected to play a significant role in that transition, particularly for existing buildings connected to the gas network. The government's Hydrogen Strategy outlined plans for up to 35% of UK energy consumption to come from hydrogen by 2035. The Northwest of England, through the North West Hydrogen Alliance, is positioned as the primary region for developing a decarbonised, hydrogen-based energy market in the UK.


Installing air-source heat pumps at Robert Lynch House would have required significant capital expenditure on a system that could become redundant within a decade as the gas network transitions to hydrogen. The hydrogen-ready Rinnai boilers provide a practical, economical bridge. They deliver immediate efficiency gains with natural gas today while remaining fully adaptable to hydrogen tomorrow. Our earlier blog on hydrogen fuelling the UK's net zero goals explores the broader context behind this technology shift.


The building's management initially needed convincing. After conducting their own independent research, they agreed with the recommendation. It is the kind of honest, technically informed advice that prioritises the housing association's long-term financial interests over a larger short-term contract value. That approach is central to how DD Wilson operates. Read what other customers say about working with the team on the DD Wilson customer reviews page.


New Ofgem Heat Network Regulations: What Housing Associations Need to Know in 2026

This installation is particularly timely because of a major regulatory change that came into effect on 27 January 2026. Under the Heat Networks (Market Framework) (Great Britain) Regulations 2026, Ofgem has become the statutory regulator for heat networks across Great Britain. This directly affects housing associations like the one operating Robert Lynch House.

A communal heat network is a system in which heating, cooling, or hot water is produced centrally and distributed to multiple premises via pipes. According to the National Housing Federation, around 180,000 housing association households in England are connected to a heat network, with two-thirds of all existing heat networks owned and managed by social landlords. The vast majority of housing association blocks with centralised plant rooms and communal boiler systems now fall under this regulatory framework.


The key requirements for housing associations include the following.


From 27 January 2026, all existing heat networks are deemed temporarily authorised by Ofgem. Housing associations operating heat networks must register with Ofgem via a new digital service by January 2027. Ofgem now has full enforcement powers, including financial penalties of up to 10 per cent of an organisation's annual turnover or £ 1 million, whichever is higher. Regulations cover fair pricing, billing transparency, metering, complaints handling, debt management, vulnerability protections, and performance standards. Housing associations are now treated as regulated energy suppliers under the new framework.


For housing associations still operating ageing, inefficient communal heating systems, the new regulations add urgency to upgrading. Guaranteed Standards of Performance, including repair times and outage response targets, are expected to take effect from 2027. Buildings running on outdated equipment with no built-in redundancy face increased compliance risk. Housing associations that also require commercial gas safety certificates (CP42) should ensure their systems meet current standards before the new performance benchmarks are enforced.


The Rinnai system installed at Robert Lynch House directly addresses several of these regulatory requirements. The relay system with built-in redundancy minimises the risk of outages. The modern metering and control capabilities support billing transparency. The 50% reduction in gas costs supports fair pricing obligations. The hydrogen-ready specification aligns with long-term decarbonisation requirements.


If your housing association is unsure whether your communal heating system falls under the new regulations, or if you need to upgrade your systems before compliance deadlines, contact DD Wilson for a no-obligation discussion about your options.


The People Behind the Project

One detail from the Robert Lynch House installation captures something about the kind of work DD Wilson does and the people for whom it is done.

While the team was up on the cherry picker fitting the new vertical flue to the exterior of the building, one of the elderly residents leaned out of her window and began passing cups of tea and biscuits to Stephen Boardman, one of the DD Wilson engineers, while he worked at height on the building's exterior. Stephen, whose Gas Safe qualifications span everything from central heating and water heaters to Building Regulations compliance and combustion performance analysis across both natural gas and LPG, was up a cherry picker fitting a commercial flue and still found time to have a chat with the residents. There is video footage of the moment, and it is exactly the kind of thing that happens when you are working in a building full of people who have lived there for years and treat everyone who comes through the door like family.

The residents at Robert Lynch House are absolute characters. They are out and about around the local area, full of life, and they made the DD Wilson team feel welcome from day one. It is a small moment, but it says something important. These are real people in real homes who depend on their heating and hot water systems every single day. When those systems fail, the impact on elderly and vulnerable residents is immediate and serious. Getting them back online quickly is not just a commercial objective. It is a welfare priority.

It is also not the first time DD Wilson has gone above and beyond for the communities it serves. The team's work at Northwood Chapel and at the Wirral Autism Centre reflects the same commitment to supporting vulnerable people and local organisations.


Black van with "DDWILSON.com" ad parked outside red brick apartments. Contact info in bold yellow. Other cars nearby.

Phase One Complete - What Comes Next

The installation of the hot water system at Robert Lynch House is the first phase of a larger upgrade programme. Three gas-heating boilers in the building are also scheduled for replacement at a later stage. These will also be hydrogen-ready units, continuing the building's transition to a more efficient, future-proof, and regulation-compliant heating infrastructure.

DD Wilson has a proven track record of delivering commercial heating projects across Liverpool and the Northwest, from nurseries to historic buildings. The recent Tree Tops Nursery commercial boiler installation and the League of Welldoers heating system overhaul in a historic Liverpool building demonstrate the range of commercial environments in which DD Wilson operates.

For housing associations, social housing providers, and property managers across the Northwest who need commercial heating services that deliver results on a timeline that actually works, DD Wilson is ready to talk.

Ready to Discuss Your Commercial Heating Requirements?

DD Wilson Gas & Heating Engineers Ltd has been serving Liverpool and the wider Northwest for over 27 years. From emergency boiler repairs and central heating upgrades to large-scale commercial gas engineering projects for housing associations, schools, nurseries, and businesses, we deliver work that other contractors say would take months.

Gas Safe Registered 583586 | Over 3,000 Five-Star Reviews | Family-Run Since 1998

Call us today on 0151 739 8945

See what our customers say: Read Our Reviews | Areas We Cover

Frequently Asked Questions

How quickly can DD Wilson respond to a commercial heating emergency in a housing association building?

DD Wilson Gas & Heating Engineers responded to the Robert Lynch House emergency within twenty-four hours and had a full commercial hot water system installed and operational within five working days. Industry standard timelines for commercial heating installations of this scale typically range from six to twelve weeks. DD Wilson's ability to respond rapidly is built on maintaining detailed knowledge of client buildings, keeping pre-prepared system specifications, and operating with the flexibility to redeploy engineers and resources at short notice.

What are Rinnai continuous flow hot water heaters, and why are they suitable for housing association buildings?

Rinnai continuous-flow hot water heaters are commercial-grade water-heating units manufactured by Rinnai, a global leader in gas appliance production with UK headquarters in Runcorn, Cheshire. Unlike traditional gas-fired cylinders that heat and store large volumes of water, Rinnai units heat water on demand. This eliminates standing heat loss and can reduce gas costs by up to 50% compared to older stored hot water systems. When installed in a cascade or relay configuration, multiple Rinnai units share the load based on demand and provide built-in redundancy, ensuring that if one unit fails, the remaining units can supply the entire building without interruption.

What does hydrogen-ready mean for commercial boilers and hot water systems?

A hydrogen-ready boiler or hot water heater is designed to operate on natural gas today but can be adapted to run on hydrogen-blended gas or, in some cases, one hundred per cent hydrogen when it becomes available through the UK gas network. The UK government's Hydrogen Strategy has outlined plans for hydrogen to play a significant role in decarbonising building heating. Rinnai units are currently capable of blending up to 30% hydrogen with natural gas and can be modified for full hydrogen operation. For housing associations, choosing hydrogen-ready equipment avoids the risk of investing in systems that could become obsolete as the energy transition progresses.

What are the new Ofgem heat network regulations that came into effect in January 2026?

From 27 January 2026, Ofgem became the statutory regulator for communal and district heat networks across Great Britain under the Heat Networks (Market Framework) (Great Britain) Regulations 2026. Housing associations that operate centralised heating systems supplying multiple flats or premises are now treated as regulated energy suppliers. All existing heat networks must register with Ofgem by January 2027. The regulations cover consumer protection, fair pricing, billing transparency, metering, complaints handling, vulnerability protections, and performance standards. Non-compliance can result in financial penalties of up to 10% of annual turnover or £ 1 million.

Why did DD Wilson recommend hydrogen-ready boilers instead of air source heat pumps for this housing association?

DD Wilson advised against installing air-source heat pumps at Robert Lynch House because the building is connected to the gas network and the UK's energy transition strategy includes the introduction of hydrogen-blended gas. Installing heat pumps would have required significant capital expenditure on a technology that could become redundant as the gas network transitions to hydrogen, particularly in the Northwest of England, where the North West Hydrogen Alliance is leading hydrogen infrastructure development. Hydrogen-ready Rinnai boilers deliver immediate efficiency gains on natural gas while remaining fully adaptable to hydrogen in the future, avoiding the need for costly system replacement down the line.

How does a relay system work for commercial hot water boilers in multi-occupancy buildings?

A relay system, also known as a cascade system, connects multiple hot water heaters so they operate in sequence in response to demand. At Robert Lynch House, three Rinnai units are connected on a relay. When demand is low, such as five flats calling for hot water, a single unit handles the load. As demand increases, additional units come online automatically. The system alternates which unit leads, distributing wear evenly across all three. This extends the lifespan of each unit and ensures that, if any single heater requires maintenance or fails, the remaining units can supply the entire building without interrupting residents.

Does DD Wilson provide commercial heating services for housing associations across the Northwest?

Yes. DD Wilson Gas & Heating Engineers Ltd provides both domestic and commercial gas engineering services across Liverpool and the wider Northwest of England, covering a 40-mile radius including Wirral, Merseyside, Cheshire, Lancashire, and Greater Manchester. The company's commercial capabilities include emergency response, planned installations, system upgrades, plant room refurbishments, commercial boiler repairs, and ongoing commercial boiler servicing. DD Wilson's experience at Robert Lynch House demonstrates its ability to handle large-scale commercial projects for multi-occupancy residential buildings with speed and technical expertise.

What is the typical cost saving when upgrading from old gas-fired cylinders to Rinnai continuous flow heaters?

At Robert Lynch House, the upgrade from ageing gas-fired hot water cylinders to Rinnai continuous-flow heaters is projected to reduce the building's gas bill by approximately 50%. The savings come from eliminating standing heat loss associated with stored hot water systems and from the higher thermal efficiency of modern condensing continuous-flow technology. Actual savings will vary depending on the size of the building, the condition of the existing system, usage patterns, and gas tariffs, but significant reductions in gas consumption are consistently achieved when moving from stored to continuous flow hot water systems in commercial settings.

Related Articles

bottom of page